gridprims

as of Oct 27, 2026

Power plant · EIA plant code 10700

Red Shield Envir Old Town Facility

Operator
ND Paper, Inc.
Location
Penobscot, ME (county level only)
Balancing authority
ISO New England Inc. (ISNE)
Nameplate capacity
28.5 MW
Summer capacity
21.5 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
0 MWh
Capacity factor
0.0%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
3,039 metric tons
Carbon dioxide per MWh
272 lb/MWh

eGRID reports 3,350 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Red Shield Envir Old Town Facility
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
TG4Wood/Wood Waste BiomassBLQ12.5 MW1965Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
TG6Wood/Wood Waste BiomassWDS16 MW1987Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent