Power plant · EIA plant code 141

Agua Fria

Operator
Salt River Project
Location
Maricopa, AZ (county level only)
Balancing authority
Salt River Project (SRP)
Nameplate capacity
737.5 MW
Summer capacity
741.2 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
244,296 MWh
Capacity factor
3.8%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
93,208 metric tons
Carbon dioxide per MWh
1,351 lb/MWh

eGRID reports 102,745 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Agua Fria
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
AF1Natural Gas Steam TurbineNG113.6 MW1958Operable · As of September 2026 (EIA-860M): (OP) Operating
AF2Natural Gas Steam TurbineNG113.6 MW1957Operable · As of September 2026 (EIA-860M): (OP) Operating
AF3Natural Gas Steam TurbineNG163.2 MW1961Operable · As of September 2026 (EIA-860M): (OP) Operating
AF4Natural Gas Fired Combustion TurbineNG80.5 MW1975Operable · As of September 2026 (EIA-860M): (OP) Operating
AF5Natural Gas Fired Combustion TurbineNG71.2 MW1974Operable · As of September 2026 (EIA-860M): (OP) Operating
AF6Natural Gas Fired Combustion TurbineNG71.2 MW1974Operable · As of September 2026 (EIA-860M): (OP) Operating
AF7Natural Gas Fired Combustion TurbineNG49.5 MW2022Operable · As of September 2026 (EIA-860M): (OP) Operating
AF8Natural Gas Fired Combustion TurbineNG49.5 MW2022Operable · As of September 2026 (EIA-860M): (OP) Operating
AFSB1BatteriesMWH25 MW2021Operable · As of September 2026 (EIA-860M): (OP) Operating
PV-3Solar PhotovoltaicSUN0.2 MW2001Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent