gridprims

Power plant · EIA plant code 2291

North Omaha

Operator
Omaha Public Power District
Location
Douglas, NE (county level only)
Balancing authority
Southwest Power Pool (SWPP)
Nameplate capacity
644.7 MW
Summer capacity
563.9 MW

Planned changes reported to EIA: 3 planned retirements.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
1,540,415 MWh
Capacity factor
27.3%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
1,576,364 metric tons
Carbon dioxide per MWh
2,214 lb/MWh

eGRID reports 1,737,644 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at North Omaha
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Natural Gas Steam TurbineNG73.5 MW1954Operable · Planned retirement: 2026 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
2Natural Gas Steam TurbineNG108.8 MW1957Operable · Planned retirement: 2026 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
3Natural Gas Steam TurbineNG108.8 MW1959Operable · Planned retirement: 2026 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
4Conventional Steam CoalSUB136 MW1963Operable · As of September 2026 (EIA-860M): (OP) Operating
5Conventional Steam CoalSUB217.6 MW1968Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent