Power plant · EIA plant code 2393

Gilbert

Operator
Gilbert Power, LLC
Location
Hunterdon, NJ (county level only)
Balancing authority
PJM Interconnection, LLC (PJM)
Nameplate capacity
512 MW
Summer capacity
455.2 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
88,321 MWh
Capacity factor
2.0%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
21,286 metric tons
Carbon dioxide per MWh
1,751 lb/MWh

eGRID reports 23,464 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Gilbert
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
4Natural Gas Fired Combined CycleNG54 MW1974Operable · As of September 2026 (EIA-860M): (OP) Operating
5Natural Gas Fired Combined CycleNG54 MW1974Operable · As of September 2026 (EIA-860M): (OP) Operating
6Natural Gas Fired Combined CycleNG54 MW1974Operable · As of September 2026 (EIA-860M): (OP) Operating
7Natural Gas Fired Combined CycleNG54 MW1974Operable · As of September 2026 (EIA-860M): (OP) Operating
8Natural Gas Fired Combined CycleNG135 MW1977Operable · As of September 2026 (EIA-860M): (OP) Operating
9Natural Gas Fired Combustion TurbineNG161 MW1996Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent