gridprims

Power plant · EIA plant code 3504

Stryker Creek

Operator
Luminant Generation Company LLC
Location
Cherokee, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
713.4 MW
Summer capacity
682 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
1,345,575 MWh
Capacity factor
21.5%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
639,915 metric tons
Carbon dioxide per MWh
1,306 lb/MWh

eGRID reports 705,385 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Stryker Creek
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
D1Petroleum LiquidsDFO2 MW1966Operable · As of September 2026 (EIA-860M): (OP) Operating
D2Petroleum LiquidsDFO2 MW1966Operable · As of September 2026 (EIA-860M): (OP) Operating
D3Petroleum LiquidsDFO2 MW1966Operable · As of September 2026 (EIA-860M): (OP) Operating
D4Petroleum LiquidsDFO2 MW1966Operable · As of September 2026 (EIA-860M): (OP) Operating
D5Petroleum LiquidsDFO2 MW1966Operable · As of September 2026 (EIA-860M): (OP) Operating
ST1Natural Gas Steam TurbineNG176.8 MW1958Operable · As of September 2026 (EIA-860M): (OP) Operating
ST2Natural Gas Steam TurbineNG526.6 MW1965Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem