Power plant · EIA plant code 3888

Wanapum

Operator
PUD No 2 of Grant County - (WA)
Location
Grant, WA (county level only)
Balancing authority
Public Utility District No. 2 of Grant County, Washington (GCPD)
Nameplate capacity
1,220 MW
Summer capacity
1,220 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
4,437,537 MWh
Capacity factor
41.5%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

eGRID2023 (revision 2) reports no carbon dioxide for this plant.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Wanapum
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
10AConventional HydroelectricWAT122 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
1AConventional HydroelectricWAT122 MW2013Operable · As of September 2026 (EIA-860M): (OP) Operating
2AConventional HydroelectricWAT122 MW2012Operable · As of September 2026 (EIA-860M): (OP) Operating
3AConventional HydroelectricWAT122 MW2017Operable · As of September 2026 (EIA-860M): (OP) Operating
4AConventional HydroelectricWAT122 MW2020Operable · As of September 2026 (EIA-860M): (OP) Operating
5AConventional HydroelectricWAT122 MW2012Operable · As of September 2026 (EIA-860M): (OP) Operating
6AConventional HydroelectricWAT122 MW2016Operable · As of September 2026 (EIA-860M): (OP) Operating
7AConventional HydroelectricWAT122 MW2011Operable · As of September 2026 (EIA-860M): (OP) Operating
8AConventional HydroelectricWAT122 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
9AConventional HydroelectricWAT122 MW2015Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent