gridprims

Power plant · EIA plant code 389

El Centro Hybrid

Operator
Imperial Irrigation District
Location
Imperial, CA (county level only)
Balancing authority
Imperial Irrigation District (IID)
Nameplate capacity
388.3 MW
Summer capacity
323.1 MW

Planned changes reported to EIA: 1 planned retirement and 6 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
1,089,743 MWh
Capacity factor
32.0%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
509,656 metric tons
Carbon dioxide per MWh
1,034 lb/MWh

eGRID reports 561,799 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at El Centro Hybrid
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
2Natural Gas Fired Combined CycleNG34.5 MW1952Operable · As of September 2026 (EIA-860M): (OP) Operating
2ANatural Gas Fired Combined CycleNG89.9 MW1993Operable · As of September 2026 (EIA-860M): (OP) Operating
30Natural Gas Fired Combined CycleNG65.9 MW2012Operable · As of September 2026 (EIA-860M): (OP) Operating
31Natural Gas Fired Combined CycleNG43.2 MW2012Operable · As of September 2026 (EIA-860M): (OP) Operating
32Natural Gas Fired Combined CycleNG43.2 MW2012Operable · As of September 2026 (EIA-860M): (OP) Operating
4Natural Gas Steam TurbineNG81.6 MW1968Operable · Planned retirement: 2029 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
BESSBatteriesMWH30 MW2016Operable · As of September 2026 (EIA-860M): (OP) Operating
RICE1Natural Gas Internal Combustion EngineNG18.8 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
RICE2Natural Gas Internal Combustion EngineNG18.8 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
RICE3Natural Gas Internal Combustion EngineNG18.8 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
RICE4Natural Gas Internal Combustion EngineNG18.8 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
RICE5Natural Gas Internal Combustion EngineNG18.8 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
RICE6Natural Gas Internal Combustion EngineNG18.8 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0