gridprims

Power plant · EIA plant code 52120

Freeport Energy

Operator
Olin Blue Cube Operations
Location
Brazoria, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
603.1 MW
Summer capacity
458 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
1,709,962 MWh
Capacity factor
32.4%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
707,905 metric tons
Carbon dioxide per MWh
685 lb/MWh

eGRID reports 780,332 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Freeport Energy
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
G-61Natural Gas Fired Combined CycleNG94.5 MW1982Operable · As of September 2026 (EIA-860M): (OP) Operating
G-63Natural Gas Fired Combined CycleNG94.5 MW1982Operable · As of September 2026 (EIA-860M): (OP) Operating
G-64Natural Gas Fired Combined CycleNG64.8 MW1982Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
G-65Natural Gas Fired Combined CycleNG111.3 MW1984Operable · As of September 2026 (EIA-860M): (OP) Operating
G-66Natural Gas Fired Combined CycleNG119 MW1983Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year
G-67Natural Gas Fired Combined CycleNG119 MW1984Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent