Power plant · EIA plant code 54562

Longview Fibre

Operator
Longview Fibre Co
Location
Cowlitz, WA (county level only)
Balancing authority
Bonneville Power Administration (BPAT)
Nameplate capacity
45 MW
Summer capacity
47 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
248,463 MWh
Capacity factor
63.0%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
18,546 metric tons
Carbon dioxide per MWh
239 lb/MWh

eGRID reports 20,443 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Longview Fibre
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
6Wood/Wood Waste BiomassBLQ20 MW1958Operable · As of September 2026 (EIA-860M): (OP) Operating
7Wood/Wood Waste BiomassBLQ25 MW1966Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent