gridprims

as of Oct 27, 2026

Power plant · EIA plant code 54580

Curtis Palmer Hydroelectric

Operator
Palmer Hydroelectric
Location
Saratoga, NY (county level only)
Balancing authority
New York Independent System Operator (NYIS)
Nameplate capacity
59 MW
Summer capacity
59.6 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
276,597 MWh
Capacity factor
53.5%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0

Emissions

eGRID2023 (revision 2) reports no carbon dioxide for this plant.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Curtis Palmer Hydroelectric
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
C1Conventional HydroelectricWAT2.6 MW1986Operable · As of September 2026 (EIA-860M): (OP) Operating
C2Conventional HydroelectricWAT2.6 MW1986Operable · As of September 2026 (EIA-860M): (OP) Operating
C3Conventional HydroelectricWAT2.6 MW1985Operable · As of September 2026 (EIA-860M): (OP) Operating
C4Conventional HydroelectricWAT1 MW1985Operable · As of September 2026 (EIA-860M): (OP) Operating
C5Conventional HydroelectricWAT1 MW1985Operable · As of September 2026 (EIA-860M): (OP) Operating
P1Conventional HydroelectricWAT24.6 MW1986Operable · As of September 2026 (EIA-860M): (OP) Operating
P2Conventional HydroelectricWAT24.6 MW1986Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent