gridprims

Power plant · EIA plant code 54950

Univ of Oregon Central Power Station

Operator
University of Oregon
Location
Lane, OR (county level only)
Balancing authority
Bonneville Power Administration (BPAT)
Nameplate capacity
17.6 MW
Summer capacity
15.6 MW

Planned changes reported to EIA: 1 proposed generator.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
567 MWh
Capacity factor
0.4%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
270 metric tons
Carbon dioxide per MWh
1,130 lb/MWh

eGRID reports 298 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Univ of Oregon Central Power Station
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
CTG1Natural Gas Fired Combined CycleNG7.5 MW2012Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
DG1Petroleum LiquidsDFO2.2 MW2009Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
DG2Petroleum LiquidsDFO2.2 MW2009Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
DG3Petroleum LiquidsDFO2.2 MW2009Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
DG4Petroleum LiquidsDFO3 MWProposed, planned start 2026 · As of September 2026 (EIA-860M): (OP) Operating
STG1Natural Gas Fired Combined CycleNG3.5 MW2012Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent