gridprims

as of Oct 27, 2026

Power plant · EIA plant code 55097

Lamar Power Project

Operator
LaFrontera Holdings LLC
Location
Lamar, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
1,112.6 MW
Summer capacity
1,044 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
6,862,791 MWh
Capacity factor
70.4%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
2,174,796 metric tons
Carbon dioxide per MWh
847 lb/MWh

eGRID reports 2,397,303 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Lamar Power Project
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
CTG1Natural Gas Fired Combined CycleNG176 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating
CTG2Natural Gas Fired Combined CycleNG176 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating
CTG3Natural Gas Fired Combined CycleNG176 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating
CTG4Natural Gas Fired Combined CycleNG176 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating
STG1Natural Gas Fired Combined CycleNG204.3 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating
STG2Natural Gas Fired Combined CycleNG204.3 MW2000Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. Only what you see in the preview below is sent, and only when you press Send.

Exactly what will be sent