gridprims

Power plant · EIA plant code 55168

Bastrop Energy Center

Operator
Bastrop Energy Partners, LP
Location
Bastrop, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
618.7 MW
Summer capacity
575 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
2,298,192 MWh
Capacity factor
42.4%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
1,173,100 metric tons
Carbon dioxide per MWh
856 lb/MWh

eGRID reports 1,293,121 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Bastrop Energy Center
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
0001Natural Gas Fired Combined CycleNG188.2 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
0002Natural Gas Fired Combined CycleNG188.2 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
0003Natural Gas Fired Combined CycleNG242.3 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem