Power plant · EIA plant code 56

Lowman Energy Center

Operator
PowerSouth Energy Cooperative
Location
Washington, AL (county level only)
Balancing authority
Southern Company Services, Inc. - Trans (SOCO)
Nameplate capacity
732.7 MW
Summer capacity
639 MW

Planned changes reported to EIA: 1 proposed generator.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
4,338,785 MWh
Capacity factor
67.6%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
586,100 metric tons
Carbon dioxide per MWh
963 lb/MWh

eGRID reports 646,065 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Lowman Energy Center
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
LEC1Natural Gas Fired Combined CycleNG459 MW2023Operable · As of September 2026 (EIA-860M): (OP) Operating
LEC2Natural Gas Fired Combined CycleNG273.7 MW2023Operable · As of September 2026 (EIA-860M): (OP) Operating
LEC3Natural Gas Fired Combustion TurbineNG438 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent