Power plant · EIA plant code 56234

Caithness Long Island Energy Center

Operator
Caithness Long Island, LLC
Location
Suffolk, NY (county level only)
Balancing authority
New York Independent System Operator (NYIS)
Nameplate capacity
348.9 MW
Summer capacity
317.3 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
2,387,956 MWh
Capacity factor
78.1%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
897,367 metric tons
Carbon dioxide per MWh
803 lb/MWh

eGRID reports 989,178 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Caithness Long Island Energy Center
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
CT01Natural Gas Fired Combined CycleNG196.2 MW2009Operable · As of September 2026 (EIA-860M): (OP) Operating
ST01Natural Gas Fired Combined CycleNG152.7 MW2009Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent