gridprims

Power plant · EIA plant code 56500

Western 102 Power Plant

Operator
Nevada Gold Mines
Location
Storey, NV (county level only)
Balancing authority
Nevada Power Company (NEVP)
Nameplate capacity
118.6 MW
Summer capacity
119.7 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
406,176 MWh
Capacity factor
39.1%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
225,820 metric tons
Carbon dioxide per MWh
1,015 lb/MWh

eGRID reports 248,924 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Western 102 Power Plant
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
A101Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
B102Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
B202Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
C102Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
C202Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
D101Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
E102Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
E202Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
F102Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
F202Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
G102Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
G202Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
H102Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
H202Natural Gas Internal Combustion EngineNG8.4 MW2005Operable · As of September 2026 (EIA-860M): (OP) Operating
PV1Solar PhotovoltaicSUN1 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent