gridprims

as of Oct 27, 2026

Power plant · EIA plant code 57600

Fishers Island 1

Operator
Connecticut Mun Elec Engy Coop
Location
Suffolk, NY (county level only)
Balancing authority
ISO New England Inc. (ISNE)
Nameplate capacity
2.6 MW
Summer capacity
2.5 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
129 MWh
Capacity factor
0.6%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
111 metric tons
Carbon dioxide per MWh
2,052 lb/MWh

eGRID reports 122 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Fishers Island 1
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
FI1Petroleum LiquidsDFO2.6 MW2010Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent