gridprims

Power plant · EIA plant code 57899

Hurricane City Power

Operator
Hurricane City Power - (UT)
Location
Washington, UT (county level only)
Balancing authority
PacifiCorp - East (PACE)
Nameplate capacity
15.1 MW
Summer capacity
14.3 MW

Planned changes reported to EIA: 1 proposed generator.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
7,003 MWh
Capacity factor
5.3%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
2,678 metric tons
Carbon dioxide per MWh
1,710 lb/MWh

eGRID reports 2,952 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Hurricane City Power
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Petroleum LiquidsDFO1.7 MW2001Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
2Petroleum LiquidsDFO1.7 MW1999Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
3Petroleum LiquidsDFO1.7 MW1999Operable · As of September 2026 (EIA-860M): (SB) Standby/Backup: available for service but not normally used
4Natural Gas Internal Combustion EngineNG2 MW2004Operable · As of September 2026 (EIA-860M): (OP) Operating
5Natural Gas Internal Combustion EngineNG2 MW2004Operable · As of September 2026 (EIA-860M): (OP) Operating
6Natural Gas Internal Combustion EngineNG2 MW2006Operable · As of September 2026 (EIA-860M): (OP) Operating
7Natural Gas Internal Combustion EngineNG2 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
8Natural Gas Internal Combustion EngineNG2 MW2007Operable · As of September 2026 (EIA-860M): (OP) Operating
9Natural Gas Internal Combustion EngineNG2 MWProposed, planned start 2028

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent