gridprims

Power plant · EIA plant code 58168

Energy Center

Operator
University of Redlands
Location
San Bernardino, CA (county level only)
Balancing authority
California Independent System Operator (CISO)
Nameplate capacity
0.9 MW
Summer capacity
0.9 MW

Planned changes reported to EIA: 3 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
4,360 MWh
Capacity factor
55.3%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
1,896 metric tons
Carbon dioxide per MWh
880 lb/MWh

eGRID reports 2,090 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Energy Center
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
TURB1Natural Gas Fired Combustion TurbineNG0.3 MW2019Operable · As of September 2026 (EIA-860M): (OP) Operating
TURB2Natural Gas Fired Combustion TurbineNG0.3 MW2019Operable · As of September 2026 (EIA-860M): (OP) Operating
TURB3Natural Gas Fired Combustion TurbineNG0.3 MW2019Operable · As of September 2026 (EIA-860M): (OP) Operating
TURB4Natural Gas Fired Combustion TurbineNG0.3 MWProposed, planned start 2030 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
TURB5Natural Gas Fired Combustion TurbineNG0.3 MWProposed, planned start 2030 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
TURB6Natural Gas Fired Combustion TurbineNG0.3 MWProposed, planned start 2030 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent