Power plant · EIA plant code 58840

Kenansville Solar Farm, LLC

Operator
SRE Utility Solar 1, LLC
Location
Duplin, NC (county level only)
Balancing authority
Duke Energy Carolinas (DUK)
Nameplate capacity
4.5 MW
Summer capacity
4.5 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
0 MWh
Capacity factor
0.0%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0

Emissions

eGRID2023 (revision 2) reports no carbon dioxide for this plant.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Kenansville Solar Farm, LLC
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
INV1Solar PhotovoltaicSUN0.5 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
INV2Solar PhotovoltaicSUN0.5 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
INV3Solar PhotovoltaicSUN0.5 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
INV4Solar PhotovoltaicSUN0.5 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
INV5Solar PhotovoltaicSUN0.5 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
INV6Solar PhotovoltaicSUN0.5 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
INV7Solar PhotovoltaicSUN0.5 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
INV8Solar PhotovoltaicSUN0.5 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating
INV9Solar PhotovoltaicSUN0.5 MW2014Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0