gridprims

Power plant · EIA plant code 61346

RE Maplewood

Operator
Onward Energy
Location
Pecos, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
250 MW
Summer capacity
250 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
526,415 MWh
Capacity factor
24.0%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

eGRID2023 (revision 2) reports no carbon dioxide for this plant.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at RE Maplewood
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
PV1Solar PhotovoltaicSUN222 MW2021Operable · As of September 2026 (EIA-860M): (OP) Operating
PV2Solar PhotovoltaicSUN28 MW2021Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.