Power plant · EIA plant code 628

Crystal River

Operator
Duke Energy Florida, LLC
Location
Citrus, FL (county level only)
Balancing authority
Progress Energy Florida (FPC)
Nameplate capacity
3,449 MW
Summer capacity
3,039 MW

Planned changes reported to EIA: 2 planned retirements.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
15,307,405 MWh
Capacity factor
50.7%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
8,344,758 metric tons
Carbon dioxide per MWh
1,144 lb/MWh

eGRID reports 9,198,521 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Crystal River
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1GTANatural Gas Fired Combined CycleNG310.3 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
1GTBNatural Gas Fired Combined CycleNG310.3 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
2GTANatural Gas Fired Combined CycleNG310.3 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
2GTBNatural Gas Fired Combined CycleNG310.3 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
5Conventional Steam CoalBIT739.2 MW1984Operable · Planned retirement: 2034 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
CC1STNatural Gas Fired Combined CycleNG364.7 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
CC2STNatural Gas Fired Combined CycleNG364.7 MW2018Operable · As of September 2026 (EIA-860M): (OP) Operating
ST4Conventional Steam CoalBIT739.2 MW1982Operable · Planned retirement: 2034 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0