Power plant · EIA plant code 65975

Starr Solar Ranch

Operator
Lightsource Renewable Energy Asset Management, LLC
Location
Starr, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
136 MW
Summer capacity
136 MW

Planned changes reported to EIA: 1 proposed generator.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
272,169 MWh
Capacity factor
22.8%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

This plant is not in eGRID2023 (revision 2).

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Starr Solar Ranch
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
TXSD2BatteriesMWH180 MWProposed, planned start 2031 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction
TXST1Solar PhotovoltaicSUN136 MW2024Operable · As of September 2026 (EIA-860M): (OP) Operating

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent