gridprims

Power plant · EIA plant code 6761

Rawhide

Operator
Platte River Power Authority
Location
Larimer, CO (county level only)
Balancing authority
Public Service Company of Colorado (PSCO)
Nameplate capacity
800.4 MW
Summer capacity
668 MW

Planned changes reported to EIA: 1 planned retirement and 5 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
1,333,884 MWh
Capacity factor
19.0%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
1,440,225 metric tons
Carbon dioxide per MWh
2,115 lb/MWh

eGRID reports 1,587,576 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Rawhide
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1Conventional Steam CoalSUB293.6 MW1984Operable · Planned retirement: 2029 (reported to EIA) · As of September 2026 (EIA-860M): (OP) Operating
ANatural Gas Fired Combustion TurbineNG89.3 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
BNatural Gas Fired Combustion TurbineNG89.3 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
CNatural Gas Fired Combustion TurbineNG89.3 MW2002Operable · As of September 2026 (EIA-860M): (OP) Operating
DNatural Gas Fired Combustion TurbineNG89.3 MW2004Operable · As of September 2026 (EIA-860M): (OP) Operating
FNatural Gas Fired Combustion TurbineNG149.6 MW2008Operable · As of September 2026 (EIA-860M): (OP) Operating
GNatural Gas Fired Combustion TurbineNG44.6 MWProposed, planned start 2028 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
HNatural Gas Fired Combustion TurbineNG44.6 MWProposed, planned start 2028 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
LM3Natural Gas Fired Combustion TurbineNG44.6 MWProposed, planned start 2028 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
LM4Natural Gas Fired Combustion TurbineNG44.6 MWProposed, planned start 2028 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
LM5Natural Gas Fired Combustion TurbineNG44.6 MWProposed, planned start 2028 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0