gridprims

Power plant · EIA plant code 67987

Mystic Springs Renewable Energy (Hybrid)

Operator
Vesper Energy Development LLC
Location
Kaufman, TX (county level only)
Balancing authority
Electric Reliability Council of Texas, Inc. (ERCO)
Nameplate capacity
0 MW
Summer capacity
0 MW

Planned changes reported to EIA: 2 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
Not reported
Capacity factor
No EIA-923 generation for 2025

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

This plant is not in eGRID2023 (revision 2).

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Mystic Springs Renewable Energy (Hybrid)
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
MYSPBBatteriesMWH250 MWProposed, planned start 2028 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
MYSPSSolar PhotovoltaicSUN250 MWProposed, planned start 2028 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent