Power plant · EIA plant code 69773
Mohave Energy Park
- Operator
- Arizona Electric Pwr Coop Inc
- Location
- Mohave, AZ (county level only)
- Balancing authority
- Western Area Power Administration - Desert Southwest Region (WALC)
- Nameplate capacity
- 0 MW
- Summer capacity
- 0 MW
Planned changes reported to EIA: 4 proposed generators.
U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 10, 2027. Last checked for an update: Oct 31, 2026.
Generation in 2025
- Net generation
- Not reported
- Capacity factor
- No EIA-923 generation for 2025
Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.
U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 11, 2027. Last checked for an update: Oct 31, 2026.
Emissions
This plant is not in eGRID2023 (revision 2).
U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Jan 31, 2026. Last checked for an update: Oct 31, 2026.
Generators
| Generator | Technology | Energy source | Nameplate | Operating since | Status |
|---|---|---|---|---|---|
| GT1 | Natural Gas Fired Combustion Turbine | NG | 60.5 MW | Proposed, planned start 2027 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction | |
| GT2 | Natural Gas Fired Combustion Turbine | NG | 60.5 MW | Proposed, planned start 2027 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction | |
| GT3 | Natural Gas Fired Combustion Turbine | NG | 60.5 MW | Proposed, planned start 2027 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction | |
| GT4 | Natural Gas Fired Combustion Turbine | NG | 60.5 MW | Proposed, planned start 2027 · As of September 2026 (EIA-860M): (L) Regulatory approvals pending. Not under construction |
U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Nov 23, 2026. Last checked for an update: Oct 31, 2026.