Power plant · EIA plant code 8059
Comanche (OK)
- Operator
- Public Service Co of Oklahoma
- Location
- Comanche, OK (county level only)
- Balancing authority
- Southwest Power Pool (SWPP)
- Nameplate capacity
- 294 MW
- Summer capacity
- 237 MW
Planned changes reported to EIA: 4 proposed generators.
U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 10, 2027. Last checked for an update: Oct 31, 2026.
Generation in 2025
- Net generation
- 331,292 MWh
- Capacity factor
- 12.9%
Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.
U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Sep 11, 2027. Last checked for an update: Oct 31, 2026.
Emissions
- Carbon dioxide in 2023
- 268,727 metric tons
- Carbon dioxide per MWh
- 1,157 lb/MWh
eGRID reports 296,220 short tons. One short ton is 0.90718474 metric tons.
Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.
U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Jan 31, 2026. Last checked for an update: Oct 31, 2026.
Generators
| Generator | Technology | Energy source | Nameplate | Operating since | Status |
|---|---|---|---|---|---|
| 1G1 | Natural Gas Fired Combined Cycle | NG | 85 MW | 1973 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
| 1G2 | Natural Gas Fired Combined Cycle | NG | 85 MW | 1973 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
| 1S | Natural Gas Fired Combined Cycle | NG | 120 MW | 1974 | Operable · As of September 2026 (EIA-860M): (OP) Operating |
| 2G1 | Natural Gas Fired Combined Cycle | NG | 408.8 MW | Proposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated | |
| 2S1 | Natural Gas Fired Combined Cycle | NG | 277.6 MW | Proposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated | |
| 3G1 | Natural Gas Fired Combined Cycle | NG | 408.8 MW | Proposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated | |
| 3S1 | Natural Gas Fired Combined Cycle | NG | 277.6 MW | Proposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated | |
| IC1 | Petroleum Liquids | DFO | 4 MW | 1962 | Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year |
U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0 May be out of date. The next release was due by Nov 23, 2026. Last checked for an update: Oct 31, 2026.