gridprims

Power plant · EIA plant code 8059

Comanche (OK)

Operator
Public Service Co of Oklahoma
Location
Comanche, OK (county level only)
Balancing authority
Southwest Power Pool (SWPP)
Nameplate capacity
294 MW
Summer capacity
237 MW

Planned changes reported to EIA: 4 proposed generators.

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
331,292 MWh
Capacity factor
12.9%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Emissions

Carbon dioxide in 2023
268,727 metric tons
Carbon dioxide per MWh
1,157 lb/MWh

eGRID reports 296,220 short tons. One short ton is 0.90718474 metric tons.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Comanche (OK)
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
1G1Natural Gas Fired Combined CycleNG85 MW1973Operable · As of September 2026 (EIA-860M): (OP) Operating
1G2Natural Gas Fired Combined CycleNG85 MW1973Operable · As of September 2026 (EIA-860M): (OP) Operating
1SNatural Gas Fired Combined CycleNG120 MW1974Operable · As of September 2026 (EIA-860M): (OP) Operating
2G1Natural Gas Fired Combined CycleNG408.8 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
2S1Natural Gas Fired Combined CycleNG277.6 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
3G1Natural Gas Fired Combined CycleNG408.8 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
3S1Natural Gas Fired Combined CycleNG277.6 MWProposed, planned start 2029 · As of September 2026 (EIA-860M): (P) Planned for installation, but regulatory approvals not initiated
IC1Petroleum LiquidsDFO4 MW1962Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Report a problem

Tell us what looks wrong. The report holds only what you see in the preview below. Nothing is sent until you press Send.

Exactly what will be sent