Electric utility · EIA utility id 18305

Sumter Electric Member Corp

Ownership, as EIA reports it
Cooperative
States served
GA
Customers in 2025
21,473
Sales in 2025
380,843 MWh
Revenue in 2025
$56,586,300

U.S. Energy Information Administration · Annual Electric Power Industry Report (Form EIA-861) · data for 2025 · as of Oct 7, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

If Sumter Electric Member Corp sends your bill

What it sells and charges

Full service (energy and delivery)

Full service (energy and delivery)
SectorCustomersSales (MWh)RevenueAverage price (cents per kWh)
Residential15,145236,883$34,633,20014.62
Commercial6,318112,294$18,243,00016.25
Industrial1031,666$3,710,10011.72

Its average price is 1% below the state average for residential customers (14.74 cents per kWh in GA).

How we got this

$34,633,200 residential revenue ÷ 236,883,000 kWh residential sales = 14.62 cents per kWh

Average price is revenue divided by sales, for full-service customers only. It averages every rate and every month, so one household's price can differ. State averages count revenue from every kind of service and sales only once, as EIA does.

Trends, 2021 to 2025

0510 20212022202320242025 ¢/kWh Residential average price (cents per kWh)
From 2021 to 2025, the residential figure went from 13.03 to 14.62 cents per kWh.
05,00010,00015,00020,000 20212022202320242025 Customers Customers
From 2021 to 2025, customers went from 20,859 to 21,473.
Trend table
Trend table
YearResidential average price (cents per kWh)Customers
202113.0320,859
202213.4021,046
202313.8121,154
202414.1421,314
202514.6221,473

U.S. Energy Information Administration · Annual Electric Power Industry Report (Form EIA-861), 2021 to 2025 · data for 2021-2025 · as of Oct 7, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Annual peak demand

Not reported to FERC. Only utilities that plan or balance their own system file Form 714.

Catalyst Cooperative (PUDL), from FERC Form 714 · Annual peak demand by planning area (FERC Form 714, through PUDL) · data for 2006-2025 · as of Oct 14, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Reliability

Reliability
StateStandardSAIDI with major events (minutes)SAIFI with major eventsSAIDI without major events (minutes)SAIFI without major events
GAIEEE 1366159.43134.15

SAIDI is the average minutes without power per customer in the year; SAIFI is how many outages the average customer had. Major event days are storms and similar rare days, counted with and without.

Generation it operates

It operates no power plants listed in EIA-860, so it buys all of its power.

Published rates

9 rates in the OpenEI database, newest updated Mar 26, 2015.

OpenEI (National Laboratory of the Rockies), with rates entered by contributors · U.S. Utility Rate Database (OpenEI) · data for 2026-10 · as of Oct 30, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Customer-owned generation (net metering)

Net-metered capacity in Sumter Electric Member Corp by technology, MW, with installations and energy sold back to the grid
YearPhotovoltaic (MW)Battery or storage (MW)Wind (MW)Other (MW)All technologies (MW)InstallationsEnergy sold back (MWh)
20210.70.10.732
20220.90.20.959
20231.00.11.067320
20241.30.41.371395
20251.30.41.376406

Before 2023, EIA reported storage paired with photovoltaic inside the photovoltaic group; from 2023, batteries are their own group, paired with photovoltaic or not. Neither is added into photovoltaic here.

Net metering by sector, 2025
SectorAll technologies (MW)InstallationsEnergy sold back (MWh)
Residential0.568222
Commercial0.88184

Net metering in GA

We do not restate net metering rules, which change. The rules are with Georgia Public Service Commission · the DSIRE policy database (NC Clean Energy Technology Center)

U.S. Energy Information Administration · Net metering and other distributed generation (Form EIA-861), 2021 to 2025 · data for 2025 · as of Oct 7, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0