Power plant · EIA plant code 3886

Wells

Operator
PUD No 1 of Douglas County - (WA)
Location
Chelan, WA (county level only)
Balancing authority
PUD No. 1 of Douglas County (DOPD)
Nameplate capacity
866.8 MW
Summer capacity
880 MW

U.S. Energy Information Administration · Annual Electric Generator Report (Form EIA-860) · data for 2025 · as of Sep 10, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0

Generation in 2025

Net generation
3,707,938 MWh
Capacity factor
48.8%

Capacity factor is net generation divided by nameplate capacity times the hours each generator was in service that year, counted by month.

U.S. Energy Information Administration · Power Plant Operations Report (Form EIA-923) · data for 2025 · as of Sep 11, 2026 · retrieved Nov 1, 2026 · CC-BY-4.0

Emissions

eGRID2023 (revision 2) reports no carbon dioxide for this plant.

Emissions are for 2023, the newest eGRID year. Generation is for 2025, the newest EIA-923 year.

U.S. Environmental Protection Agency · Emissions & Generation Resource Integrated Database (eGRID) · data for 2023 · as of Jun 16, 2025 · retrieved Oct 31, 2026 · CC-BY-4.0

Generators

Generators at Wells
GeneratorTechnologyEnergy sourceNameplateOperating sinceStatus
U-1Conventional HydroelectricWAT77.4 MW1967Operable · As of September 2026 (EIA-860M): (OP) Operating
U-10Conventional HydroelectricWAT89 MW1969Operable · As of September 2026 (EIA-860M): (OP) Operating
U-2Conventional HydroelectricWAT89 MW1967Operable · As of September 2026 (EIA-860M): (OP) Operating
U-3Conventional HydroelectricWAT89 MW1967Operable · As of September 2026 (EIA-860M): (OP) Operating
U-4Conventional HydroelectricWAT89 MW1967Operable · As of September 2026 (EIA-860M): (OP) Operating
U-5Conventional HydroelectricWAT89 MW1967Operable · As of September 2026 (EIA-860M): (OP) Operating
U-6Conventional HydroelectricWAT89 MW1967Operable · As of September 2026 (EIA-860M): (OP) Operating
U-7Conventional HydroelectricWAT89 MW1967Operable · As of September 2026 (EIA-860M): (OP) Operating
U-8Conventional HydroelectricWAT89 MW1968Operable · As of September 2026 (EIA-860M): (OP) Operating
U-9Conventional HydroelectricWAT77.4 MW1969Operable · As of September 2026 (EIA-860M): (OS) Out of service and NOT expected to return to service in next calendar year

U.S. Energy Information Administration · Monthly Update to the Annual Electric Generator Report (Form EIA-860M) · data for 2026-09 · as of Oct 23, 2026 · retrieved Oct 31, 2026 · CC-BY-4.0